MetaTOC stay on top of your field, easily

A comparative analysis of constraint and connectivity graph techniques for assembly sequence generation in robotic assembly cells

,

Proceedings of the Institution of Mechanical Engineers, Part E: Journal of Process Mechanical Engineering

Published online on

Abstract

Proceedings of the Institution of Mechanical Engineers, Part E: Journal of Process Mechanical Engineering, Volume 240, Issue 2, Page 1309-1317, April 2026.
The paper describes a comparative study on the assortment of appropriate assembly-generating techniques for robotic assembly cells. Several techniques have been developed and tested for the creation of viable sequences. Most of these techniques employ ...